Classification de la soumission: |
Services
|
---|---|
Numéro d'enchère: | 2023-RFP-87 |
Nom de la soumission: | Regional Road 81 (Main St. W.) 4 Phase Project in Town of Grimsby |
Statut de l'enchère: | attribué |
Date de l'adjudication: | ven. janv. 26, 2024 (EST) |
Date de publication de la soumission: | mar. oct. 3, 2023 2:10:59 (EDT) |
Date de fermeture de la soumission: | ven. nov. 3, 2023 2:00:59 (EDT) |
Date limite pour les questions: | mer. oct. 25, 2023 12:00:00 (EDT) |
Durée en mois: | 120 |
Type de négociation: | Refer to project document |
Conditions de participation: | Refer to project document |
Enchères électroniques: | Not Applicable |
Langue pour les soumissions d'offres: | English unless specified in the bid document |
Type de soumission: | Online Submissions Only |
Adresse de soumission: | Online Submissions Only |
Ouverture publique: | No |
Description: |
This Request for Proposal (the “RFP”) is an invitation by the Regional Municipality of Niagara (“Niagara Region”) to prospective proponents to submit proposals for Regional Road 81 (Main St. W.) 4 Phase Project in Town of Grimsby, as further described in Section A of the RFP Particulars (Appendix B) (the “Deliverables”). This RFP is being issued to a subset of the Successful Roster Listing developed from Contract 2021-RFSQ-227 specifically Category 13. Regional Road 81 (Main Street East) is a major east/west roadway extending from Orchard Road to Nelles Road; Nelles Road to Baker Road; Baker Road to Park Road and Park Road to the Durham Road Roundabout. The purpose of this MCEA schedule A and detailed design is to address the transportation master plan which includes cycling facilities and to determine which sections of this road should be urbanized and which road sections of this road should be addressed as rural under the complete streets typology. It is noted that from the New High School (located at 5699 King St) to Park Rd will be urbanized. Phase 1 section is transitioning from Rural Scenic (potentially from in boulevard cycle tracks) at east limit; there may be a need for an appropriate cycling facility transition (OTM Book 18, Section 6.6 Facility Transitions). The four (4) phases of project limits for Regional Road 81 (Main St East) in the Town of Grimsby that currently function as two lane road serving east/west traffic are: i. Phase 1 RR81 Main St E from Park Rd to the Durham Rd roundabout, a length of approximately 1.6km (Appendix D [Key Plan]). The 2021 average annual daily traffic of 12,500 – construction funding anticipated in 2024
ii. Phase 2 RR81 Main St E from Park Rd to Baker Rd a length of approximately 0.8km (Appendix D [Key Plan]). The 2021 average annual daily traffic of 12,500 – construction funding anticipated in 2028
iii. Phase 3 RR81 Main St E from Baker Rd to Nelles Rd, a length of approximately 0.8km (Appendix D [Key Plan]). The 2021 average annual daily traffic of 12,500 – construction funding anticipated in 2030
iv. Phase 4 RR81 Main St E from Nelles to Orchard Rd, a length of approximately 0.6km (Appendix D [Key Plan]). The 2021 average annual daily traffic of 12,500 - construction funding anticipated in 2032
This thoroughfare provides access to residential/ cemetery/ school/ commercial/ industrial uses. Land use within the study area is primarily residential/commercial/agricultural. The Niagara Region Transportation Master Plan (TMP) sets out the strategic vision for transportation in the Niagara Region over the next 25 years. As Niagara Region implements its future growth plan outlined in How We GROW, the TMP ensures that Niagara Region plans and budgets for future transportation needs for an integrated network of cycling and pedestrian facilities, transit, roads, and highways. The TMP also recommends an updated and expanded set of policies to guide future transportation and land development decisions. The major components of the TMP are: the Regional Road System; Transportation Demand Management; Transportation Systems Management; Public Transit Active Transportation; Complete Streets; and Goods Movement. Niagara Region is committed to implementing the overall goals of the TMP as part of its transportation capital projects. Projects in the area that may impact this project include, but are not limited to:
|
Accès aux documents d'appel d'offres: | L'aperçu des documents d'appel d'offres, les avis d'appel d'offres et les avis d'attribution sont disponibles gratuitement sur le site. Les fournisseurs ne sont pas tenus de s'inscrire à un appel d'offres avant de pouvoir consulter les documents d'appel d'offres non sécurisés. Veuillez noter que certains documents peuvent être sécurisés et qu'il vous sera demandé de vous inscrire à l'appel d'offres pour télécharger et consulter les documents. Pour obtenir une version non sécurisée du dossier d'appel d'offres et/ou pour participer à cette opportunité, des frais annuels ou par offre doivent être payés (frais annuels - 461,90 $, frais par offre - 138,64 $). |
Accord commercial: |
Afficher les accords commerciaux [+]
Accord de libre-échange canadien (ALEC)
|
Catégories: |
Afficher les catégories [+]
|
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.